Hooled Epoxy Dry Hanging Adhesive
Category:
Detailed introduction
Use:
Bonding dry hanging of various stones. Reinforcement and bonding, caulking, repairing, sealing, etc. of reinforced concrete building structures.
How to use:
1. Clean up the surface to be glued.
2. Mix the A and B components 1:1 and stir until completely homogeneous.
3. Use a spatula or other special tools to glue.
Building materials industry standard number
JC887-2001 (epoxy adhesive for dry hanging stone curtain wall)
Notes
1. The bonding surface is too smooth, it is recommended to do surface roughness treatment first.
2. Dry hanging rubber cannot bear weight in the early stage of curing.
3. The validity period of the colloid mixing is within 15 minutes.
4. The initial solidification time (at 25 °C) after mixing is 30-60 minutes, and it is completely cured and reaches considerable strength after 24 hours, and the shelf life is 48 hours.
Under normal temperature (25°C), the storage period is 1 year.
Expired products, after testing, if the performance is qualified, can still be used.
Weight (AB)
A and B are 9kg each, a total of 18kg.
Key words:
Previous Page:
Next page:
Related Products
Online Inquiry